GameChange Launches Pour-in-Place Ground System

GameChange Solar RackingGameChange Racking says its self-leveling Pour-in-Place ballasted ground system reduces installation time by 68 percent.

Forms are placed and supported, the concrete is poured and panels are mounted.

The system is rated for 120 mph wind speed and meets IBC and ASME standards for structural loading.

Share on Facebook0Tweet about this on Twitter0Share on LinkedIn0Pin on Pinterest0Email this to someone

Have a Thought to Share?

Your email address will not be published. Required fields are marked *